Netizens' practical decoration experience

2022-07-22
  • Detail

Netizens' practical decoration experience talking about

installing the overall cabinet will make the kitchen look neat. Hardware such as tracks and hinges must be used well, which will reduce a lot of collision noise and have a long life. For the sake of safety, it is best to install a socket on the upper end next to the kitchen door so that the gas alarm can be released in the future. This must not be saved. In addition, the public flue must be installed with a check valve to prevent the kitchen from smelling

first, the quality of wood should be guaranteed.

the quality and price of wood vary greatly. It is best to choose materials with hard texture and not easy to decay

it is best to use dried Larch for the keel of the ground. The floor should be paved at 30 degrees or 45 degrees, 2-3 mm should be left between the plates, and the joints should be staggered. 8-10 mm should be left between the floor and the wall. When the length of the composite floor exceeds 8 meters, expansion joints should be considered (at this time, composite skirting lines cannot be used, otherwise the joints cannot be covered). In addition, experts also suggested that the upper and lower risers of the door should be painted, the bottom of the toilet door pocket should be painted waterproof, and the sliding door made by yourself should not be made into a dark track, otherwise it will be troublesome to repair in the future. At the same time, try not to use MDF as door pocket

second, there should be no two rows of incomplete bricks

before the bricklayer starts work, let the workers check whether there are hollows and cracks in the house. If there are, repair them first. Cement can't be used more than three months after the delivery date. At the same time, cement of different varieties and grades can't be mixed. Yellow sand must be used with medium sand. Wall and floor tiles must be soaked in water for more than two hours and can be pasted after drying in the shade. It's better to buy more pieces than less, otherwise once there is a color difference, it's not easy to remedy

it should be noted that there should be no two rows of incomplete bricks on one wall, and the tiles should be cleaned immediately after pointing. The ground is paved with light colored marble. Remember to use white cement for anti-corrosion treatment on the back of the stone. The external corner should be cut at a 45 degree angle. The floor tiles must be dirt resistant and non slip. At the same time, they should be inclined to the floor drain to avoid unnecessary ponding. The wall tiles should be cut in the form of casing when they touch the pipe opening, so as to ensure that they look like a whole brick. The marble on the ground is best in the form of dry paving. Matte tiles are difficult to clean, so be careful when choosing. Also, balcony floor tiles should use special floor tiles, otherwise it is easy to get dirty. At the same time, we should also pay attention to the drainage direction to avoid unnecessary trouble

third, the environmental stimulation of water-based paint is low

wood paint try to choose paint products of well-known brands, and it is best not to blindly follow the recommendations of decoration companies or foremen. In the past two years, with the improvement of people's awareness of environmental protection, the amount of water-based paint used by brand companies is increasing rapidly. At present, the process of water-based paint has been greatly improved, but there are still weaknesses such as insufficient film plumpness, which you can choose at your discretion

the wall can be sealed with glue once. It is better to use dacron cloth where there is a gap on the wall. It is best to put bandages on the joints of gypsum board. Try not to mix water in the construction of darker and darker emulsion paint, otherwise it is easy to have color difference. The bright and mercerized emulsion paint should be completed at one time, and the color difference is easy to appear in the secondary paint repair. It should be noted that the second painting must be carried out after the previous one is completely dry, and the polishing can only be carried out after the paint surface is completely dry

when painting the door, the hinges and door locks should be pasted with masking paper. When pasting wallpaper, the wall should be painted with oil, and the panels of switches and sockets should be removed. After the skirting line is installed, the joints should be repaired with putty and emulsion paint. The paint construction on the metal surface must be treated with rust prevention. The frosted glass should be covered and protected in advance, and it is difficult to deal with it if it is stained with paint

fourth, pressure test should be done for waterproof construction

film waterproof should be used as much as possible, and the waterproof layer on the bathroom shower side should not be less than 1. 8 meters, floor drains, internal and external corners, pipelines and other places had better be waterproof once more. Try not to walk the water pipe from the ground. The cold water pipe should have a protective layer of 1 cm in the wall, and the hot water pipe should have a protective layer of 1 cm in the wall. 5 cm protective layer, so the groove should be deep. Before sealing the groove, the pressure test must be carried out on the reconstructed pipeline with a water pressure several times higher than the daily water pressure to test whether there is water leakage at the joint. The waterproof works shall be carried out after the construction and acceptance of all concealed works, and the secondary water storage test must be carried out after the waterproof construction is completed

the hot and cold water pipes should ensure that the left is hot and the right is cold, which is more in line with people's usage habits. In addition, odor proof floor drains should be used for floor drains. When installing PPR pipes and galvanized pipes, the thickness of ceramic tiles should be considered to ensure that the pipes will not be exposed

fifth, kitchen and bathroom decoration don't save money

practical functions must be considered in kitchen and bathroom decoration. Cooking takes only a few minutes, but washing takes a long time, so the water bucket in the pool must be large, and the faucet and basin should be matched. Some people have bought beautiful ones but can't fit them

installing the overall cabinet will make the kitchen look neat. The hardware such as tracks and hinges must be used well. They will reduce a lot of collision noise and have a long service life. For the sake of safety, it is best to install a socket on the upper end next to the kitchen door so that the gas alarm can be released in the future. This must not be saved. In addition, the public flue must be installed with a check valve to prevent the kitchen from smelling

if the bathroom is small, try to do a sliding door instead of a swing door; The size of the mirror in the bathroom should be considered first, otherwise the front lamp of the mirror is easy to be installed high. It is best to install anti fog mirror and splash socket in the bathroom, and the manhole should be reserved for the pipeline. Yuba should be installed on the keel, not directly on the ceiling. In addition, try not to change the launching position of the toilet. The toilet can not be installed with cement, but with silica gel. Once there is a problem, it can be disassembled

sixth, it is better to have more switches and sockets than less

the air-conditioning holes should be considered to tilt outward, otherwise rain will come in. If your house has been equipped with air-conditioning holes, when you make the ceiling, you should consider whether the original air-conditioning holes are appropriate, or properly deal with the ceiling near the air-conditioning, and try to avoid exposing the air-conditioning lines

when buying a washing machine, consider whether it is wall drainage or floor drainage. 16A socket is preferred for electric water heater and shower room with sauna function. The power socket should be 300 mm away from the ground, and the switch should be 1 mm away from the ground. About 4 meters, double control should be considered as far as possible

成都妇科医院

郑州牛皮癣医院

成都男科医院

北京皮肤病医院

Copyright © 2011 JIN SHI